Posted on: June 16, 2017

[ARCHIVED] Project Update: First Division Sewer Separation

Entire Construction Area:

  • All trees within construction limits have been pruned as needed.
  • Tree protection has been established.
  • Perimeter erosion barriers have been installed at the outfall locations.

Phase 1:  

  • All sanitary service and water main adjustments were completed.
  • New sanitary sewer and manholes were installed at the Millbridge and Barrypoint intersection and 217 Millbridge (in roadway).
  • New storm sewer installation was completed.
  • All requested private storm sewer stubs were installed.
  • Restoration process has started by preparing for new curb installation and temporary patching.

Phase 2:

  • Outfall #3 was installed at the Des Plaines River.
  • Sanitary sewer manholes were replaced near the outfall.
  • Mainline storm sewer installation is underway along Fairbank.

Two Week Outlook

Phase 1:

  • Complete concrete curb and gutter and exposed aggregate sidewalk restoration.
  • Complete temporary asphalt pavement patching along all trenches.
  • Install topsoil and sod along disturbed parkways (weather permitting).

Phase 2:

  • Continue mainline storm sewer installation on Fairbank, Barrypoint, and Bloomingbank.  Detours will be set up diverting traffic away from construction zones.
  • Begin sanitary sewer installation on Bloomingbank Rd.

Phase 3:

  • Begin storm sewer installation on (east) Scottswood.
  • Begin sanitary sewer replacement on (east) Scottswood.