Work Completed the Past Two Weeks

  • Sewer structure replacements and reconstructions have been completed.
  • Roadway grinding operations have been completed.

Upcoming Work Planned the Next Two Weeks

  • Roadway asphalt patching.
    • Impacted residents will receive notices the evening before if their driveways will be affected.
    • One lane of traffic will remain open at all times to get traffic through.
  • Full depth pavement removal and binder installation on Fairbank (addresses 100-180).
  • Install remaining concrete work.
  • Install leveling binder.